REBL participated in the removal of reactor and stripper units and all associated piping and replaced it with a new unit. The flue gas line from the regenerator was entirely replaced, as well as various new equipment installations into the existing regenerator. On-going redesign work involving the refractory was necessary and provided to the engineering group by REBL. During shutdown REBL provided not only Capital work inspection but the normal maintenance shutdown inspection along with refractory contractor scrutiny and co-ordination as well as on-site material laboratory testing, quality assurance during material installation, management reporting, and repair documentation.
Refractory Issues
Excessive Shrinkage
See some of the refractory failures we've seen →Recent Work
Refractory Design Work for Refinery
For this refinery, refractory design work involved heaters, entire sulphur plant upgrades, as well a... Read More →Refractory Installation Inspection
REBL was a key factor in the emergency shutdown of an OSB plant’s energy system, in assessing repa... Read More →Refractory Services
About Us
Refractory Issues
Ask REBL
Legal